πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Fullabrook Farm Wind Turbine

Fullabrook Farm, Fullabrook, Iflacombe, Devon, Devon, EX34 8NJ

Fullabrook Farm Wind Turbine is a 2 MW onshore wind project in South West. The applicant or operator on record is Messrs N & K A Tucker. The application has been withdrawn or the scheme abandoned. The determining authority is North Devon, reference 57572.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-09-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Fullabrook Farm Wind Turbine is a 2 MW onshore wind project in South West. The applicant or operator on record is Messrs N & K A Tucker. The application has been withdrawn or the scheme abandoned. The determining authority is North Devon, reference 57572.

Site Schematic

SOUTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMessrs N & K A Tucker
Owner / operatorMessrs N & K A Tucker
LocationFullabrook Farm, Fullabrook, Iflacombe, Devon, Devon, EX34 8NJ
RegionSouth West
Coordinates51.1409789Β°N, 4.1098643Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines1

πŸ“… Project Timeline

2014-07-07