Bioenergy / Waste

Frog Island AD Plant (Waste AD)

Creek Way, Frog Island, Rainham, London, RM13 8EN

Frog Island AD Plant (Waste AD) is a 5 MW bioenergy / waste project in London. The applicant or operator on record is Shanks Group. The application has been withdrawn or the scheme abandoned. The determining authority is Havering, reference P0530.11.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMar 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2014-05-22.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Frog Island AD Plant (Waste AD) is a 5 MW bioenergy / waste project in London. The applicant or operator on record is Shanks Group. The application has been withdrawn or the scheme abandoned. The determining authority is Havering, reference P0530.11.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperShanks Group
Owner / operatorShanks Group
Year consented2012
LocationCreek Way, Frog Island, Rainham, London, RM13 8EN
RegionLondon
Coordinates51.5075402Β°N, 0.1746581Β°E

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2011-04-06
2012-03-29