πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Freshney Green Primary Care Centre, Sorrel Road - Solar panels

Freshney Green Primary Care Centre, Sorrel Road, Grimsby, Lincolnshire, DN34 4GB

Freshney Green Primary Care Centre, Sorrel Road - Solar panels is a 0.19 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Assura Aspire Limited. Planning permission has been granted as of May 2024 and it is awaiting construction. The determini…

Consented / Approved
Project stageConsented
  1. PlanningMar 2024 (completed)
  2. ConsentedMay 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-05-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.190 MW
Registered Capacity

πŸ“‹ Project Overview

Freshney Green Primary Care Centre, Sorrel Road - Solar panels is a 0.19 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Assura Aspire Limited. Planning permission has been granted as of May 2024 and it is awaiting construction. The determining authority is North East Lincolnshire, reference DM/1227/23/PNSOL.

Site Schematic

SUBSTATION ? ha Β· 0.19 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.190 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAssura Aspire Limited
Owner / operatorAssura Aspire Limited
Year consented2024
LocationFreshney Green Primary Care Centre, Sorrel Road, Grimsby, Lincolnshire, DN34 4GB
RegionYorkshire and Humber
Coordinates53.5642763Β°N, 0.1138696Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-03-21
2024-05-15