Land East Of Little Lambriggan Farm (South West Of Higher Callestick Farm) Callestick Cornwall, Cornwall
Four Burrows Solar farm (Extension 1) is a 1.5 MW solar farm project in South West. The applicant or operator on record is Inazin Power Ltd. It is recorded as operational since February 2014. The determining authority is Cornwall, reference PA12/02338.β¦
OperationalΒ· Since 2014
Project stageOperating
PlanningMar 2012 (completed)
ConsentedMar 2013 (completed)
Construction (completed)
OperatingFeb 2014 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2014-02-26.
Registered planning capacity; not measured generation.
Four Burrows Solar farm (Extension 1) is a 1.5 MW solar farm project in South West. The applicant or operator on record is Inazin Power Ltd. It is recorded as operational since February 2014. The determining authority is Cornwall, reference PA12/02338.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Inazin Power Ltd
Owner / operator
Inazin Power Ltd
Year consented
2013
Commissioned / target
2014
Location