Fountain Lot Land At, Bentham, Bentham, Lancaster, Lancashire, North West, North Yorkshire, LA2 7EY
Fountain Lot Solar Farm is a 5 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is New Energy for the World. The planning application was refused. The determining authority is North Yorkshire, reference 08/2015/16260.β¦
Refused
Project stageRefused
PlanningOct 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-12-01.
Registered planning capacity; not measured generation.
Fountain Lot Solar Farm is a 5 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is New Energy for the World. The planning application was refused. The determining authority is North Yorkshire, reference 08/2015/16260.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
New Energy for the World
Owner / operator
New Energy for the World
Location
Fountain Lot Land At, Bentham, Bentham, Lancaster, Lancashire, North West, North Yorkshire, LA2 7EY