πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Fosse Way - Solar Farm

W/O Fosse Way, Se/O Radford Semele, Leamington Spa, Warwickshire, CV31 1XJ

Fosse Way - Solar Farm is a 49.99 MW solar farm project in West Midlands. The applicant or operator on record is Staffordshire Solar 1 Limited. The planning application was refused. The determining authority is Warwick, reference W/24/1404.…

Refused
Project stageRefused
  1. PlanningOct 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-07-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.990 MW
Registered Capacity

πŸ“‹ Project Overview

Fosse Way - Solar Farm is a 49.99 MW solar farm project in West Midlands. The applicant or operator on record is Staffordshire Solar 1 Limited. The planning application was refused. The determining authority is Warwick, reference W/24/1404.

Site Schematic

SUBSTATION ? ha Β· 49.99 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.990 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperStaffordshire Solar 1 Limited
Owner / operatorStaffordshire Solar 1 Limited
LocationW/O Fosse Way, Se/O Radford Semele, Leamington Spa, Warwickshire, CV31 1XJ
RegionWest Midlands
Coordinates52.2549639Β°N, 1.4861085Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)860000

πŸ“… Project Timeline

2024-10-15