Former Power Station, Booth Lane, Moston, Cheshire, CW11 3PY
Former EON Power Station, Booth Lane - Battery Energy Storage System is a 20 MW battery storage project in North West. The applicant or operator on record is Bluefield Sandbach Limited. Planning permission has been granted as of April 2025 and it is awaiting construction. The detβ¦
Consented / Approved
Project stageConsented
PlanningOct 2024 (completed)
ConsentedApr 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-05-20.
Registered planning capacity; not measured generation.
Former EON Power Station, Booth Lane - Battery Energy Storage System is a 20 MW battery storage project in North West. The applicant or operator on record is Bluefield Sandbach Limited. Planning permission has been granted as of April 2025 and it is awaiting construction. The determining authority is Cheshire East, reference 24/4104/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Co-located with fossil fuel plant
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Bluefield Sandbach Limited
Owner / operator
Bluefield Sandbach Limited
Year consented
2025
Location