Battery Storage

Former EON Power Station, Booth Lane - Battery Energy Storage System

Former Power Station, Booth Lane, Moston, Cheshire, CW11 3PY

Former EON Power Station, Booth Lane - Battery Energy Storage System is a 20 MW battery storage project in North West. The applicant or operator on record is Bluefield Sandbach Limited. The scheme is currently in the planning system, submitted January 2022. The determining author…

Revised
Project stageSuperseded by a new application
  1. PlanningJan 2022 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2022-01-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.000 MW
Power Capacity

πŸ“‹ Project Overview

Former EON Power Station, Booth Lane - Battery Energy Storage System is a 20 MW battery storage project in North West. The applicant or operator on record is Bluefield Sandbach Limited. The scheme is currently in the planning system, submitted January 2022. The determining authority is Cheshire East, reference 21/6426C.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20.000 MW
Battery chemistryCo-located with fossil fuel plant

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBluefield Sandbach Limited
Owner / operatorBluefield Sandbach Limited
LocationFormer Power Station, Booth Lane, Moston, Cheshire, CW11 3PY
RegionNorth West
Coordinates53.165369Β°N, 2.4063137Β°W

Additional published register fields

Registered technologyBattery
Are they re-applying (New REPD Ref)17725

πŸ“… Project Timeline

2022-01-04