Former Power Station, Booth Lane, Moston, Cheshire, CW11 3PY
Former EON Power Station, Booth Lane - Battery Energy Storage System is a 20 MW battery storage project in North West. The applicant or operator on record is Bluefield Sandbach Limited. The scheme is currently in the planning system, submitted January 2022. The determining authorβ¦
Revised
Project stageSuperseded by a new application
PlanningJan 2022 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2022-01-24.
Registered planning capacity; not measured generation.
Former EON Power Station, Booth Lane - Battery Energy Storage System is a 20 MW battery storage project in North West. The applicant or operator on record is Bluefield Sandbach Limited. The scheme is currently in the planning system, submitted January 2022. The determining authority is Cheshire East, reference 21/6426C.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Co-located with fossil fuel plant
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Bluefield Sandbach Limited
Owner / operator
Bluefield Sandbach Limited
Location
Former Power Station, Booth Lane, Moston, Cheshire, CW11 3PY