Former Broughton Lodge Resubmission

Great Broughton, Cockermouth, Cumbria. CA13 0LD, Cumbria

Former Broughton Lodge Resubmission is a 9 MW onshore wind project in North West. The applicant or operator on record is Peel Energy. The planning application was refused. The determining authority is Cumberland, reference 2/2009/0880.…

Refused
Project stageRefused
  1. PlanningDec 2009 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2011-02-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.000 MW
Registered Capacity

πŸ“‹ Project Overview

Former Broughton Lodge Resubmission is a 9 MW onshore wind project in North West. The applicant or operator on record is Peel Energy. The planning application was refused. The determining authority is Cumberland, reference 2/2009/0880.

Site Schematic

NORTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPeel Energy
Owner / operatorPeel Energy
LocationGreat Broughton, Cockermouth, Cumbria. CA13 0LD, Cumbria
RegionNorth West
Coordinates54.6704862Β°N, 3.4132714Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)3
No. of Turbines3

πŸ“… Project Timeline

2009-12-21