Great Broughton, Cockermouth, Cumbria. CA13 0LD, Cumbria
Former Broughton Lodge Resubmission is a 9 MW onshore wind project in North West. The applicant or operator on record is Peel Energy. The planning application was refused. The determining authority is Cumberland, reference 2/2009/0880.β¦
Refused
Project stageRefused
PlanningDec 2009 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2011-02-07.
Registered planning capacity; not measured generation.
Former Broughton Lodge Resubmission is a 9 MW onshore wind project in North West. The applicant or operator on record is Peel Energy. The planning application was refused. The determining authority is Cumberland, reference 2/2009/0880.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
9.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Peel Energy
Owner / operator
Peel Energy
Location
Great Broughton, Cockermouth, Cumbria. CA13 0LD, Cumbria