The Southwest Side Of Ford Rise, Bideford, Devon, EX39 5GA
Ford Rise - Micro Energy Storage is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Torridge, reference 1/0084/2025/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-04-23.
Registered planning capacity; not measured generation.
Ford Rise - Micro Energy Storage is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Torridge, reference 1/0084/2025/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Energy Services Limited
Owner / operator
AMP Energy Services Limited
Location
The Southwest Side Of Ford Rise, Bideford, Devon, EX39 5GA