π Project Overview
Flowserve Pump Division, Balderton -Solar Panels is a 0.4 MW solar farm project in East Midlands. The applicant or operator on record is Flowserve Pumps Limited. The scheme is currently in the planning system, submitted February 2026. The determining authority is Newark and Sherwood, reference 26/00163/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Flowserve Pumps Limited |
| Owner / operator | Flowserve Pumps Limited |
| Location | Flowserve Pump Division Hawton Lane Balderton, Nottinghamshire, NG24 3BU |
| Region | East Midlands |
| Coordinates | 53.057304Β°N, 0.7989077Β°W |