πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Flowserve Pump Division, Balderton -Solar Panels

Flowserve Pump Division Hawton Lane Balderton, Nottinghamshire, NG24 3BU

Flowserve Pump Division, Balderton -Solar Panels is a 0.4 MW solar farm project in East Midlands. The applicant or operator on record is Flowserve Pumps Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Ne…

Consented / Approved
Project stageConsented
  1. PlanningFeb 2026 (completed)
  2. ConsentedApr 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.400 MW
Registered Capacity

πŸ“‹ Project Overview

Flowserve Pump Division, Balderton -Solar Panels is a 0.4 MW solar farm project in East Midlands. The applicant or operator on record is Flowserve Pumps Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Newark and Sherwood, reference 26/00163/PA.

Site Schematic

SUBSTATION ? ha Β· 0.4 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFlowserve Pumps Limited
Owner / operatorFlowserve Pumps Limited
Year consented2026
LocationFlowserve Pump Division Hawton Lane Balderton, Nottinghamshire, NG24 3BU
RegionEast Midlands
Coordinates53.057304Β°N, 0.7989076Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2026-02-05
2026-04-01