π Project Overview
Flowserve Pump Division, Balderton -Solar Panels is a 0.4 MW solar farm project in East Midlands. The applicant or operator on record is Flowserve Pumps Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Newark and Sherwood, reference 26/00163/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0.400 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Flowserve Pumps Limited |
| Owner / operator | Flowserve Pumps Limited |
| Year consented | 2026 |
| Location | Flowserve Pump Division Hawton Lane Balderton, Nottinghamshire, NG24 3BU |
| Region | East Midlands |
| Coordinates | 53.057304Β°N, 0.7989076Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |