Land North Of Floods Ferry Farm
Floods Ferry Road
March
Cambridgeshire PE15 0UW, Cambridgeshire
Floods Ferry Farm is a 18 MW onshore wind project in Eastern. The applicant or operator on record is Private Developer. The planning application was refused. The determining authority is Fenland, reference F/YR09/0272/F.β¦
Refused
Project stageRefused
PlanningApr 2009 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2012-01-06.
Registered planning capacity; not measured generation.
Floods Ferry Farm is a 18 MW onshore wind project in Eastern. The applicant or operator on record is Private Developer. The planning application was refused. The determining authority is Fenland, reference F/YR09/0272/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
18.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Private Developer
Owner / operator
Private Developer
Location
Land North Of Floods Ferry Farm
Floods Ferry Road
March
Cambridgeshire PE15 0UW, Cambridgeshire