πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Fleetwood Energy Centre

Wyre Waste Recycling, Jameson Road, Fleetwood, Lancashire

Fleetwood Energy Centre is a 10 MW bioenergy / waste project in North West. The applicant or operator on record is Reform Energy. The scheme is currently in the planning system, submitted September 2011. The determining authority is Wyre, reference 11/00671/LCC.…

Revised
Project stageSuperseded by a new application
  1. PlanningSep 2011 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedNov 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2020-09-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.000 MW
Registered Capacity

πŸ“‹ Project Overview

Fleetwood Energy Centre is a 10 MW bioenergy / waste project in North West. The applicant or operator on record is Reform Energy. The scheme is currently in the planning system, submitted September 2011. The determining authority is Wyre, reference 11/00671/LCC.

πŸ”§ Technical Specifications

Capacity (MW)10.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperReform Energy
Owner / operatorReform Energy
Year consented2011
LocationWyre Waste Recycling, Jameson Road, Fleetwood, Lancashire
RegionNorth West
Coordinates53.9033515Β°N, 3.0206452Β°W

Additional published register fields

Registered technologyEfW Incineration
Are they re-applying (New REPD Ref)11895

πŸ“… Project Timeline

2011-09-15
2011-11-17