Fleeter Wood, Land adjacent to West House, Dearham, Maryport, Cumbria, CA15 7LD, Cumbria
Fleeter Wood Wind Farm is a 10 MW onshore wind project in North West. The applicant or operator on record is Novera Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2007/1271.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2007 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedJan 2009 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2009-03-30.
Registered planning capacity; not measured generation.
Fleeter Wood Wind Farm is a 10 MW onshore wind project in North West. The applicant or operator on record is Novera Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2007/1271.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Novera Energy
Owner / operator
Novera Energy
Year consented
2009
Location
Fleeter Wood, Land adjacent to West House, Dearham, Maryport, Cumbria, CA15 7LD, Cumbria