πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Fleeter Wood Wind Farm

Fleeter Wood, Land adjacent to West House, Dearham, Maryport, Cumbria, CA15 7LD, Cumbria

Fleeter Wood Wind Farm is a 10 MW onshore wind project in North West. The applicant or operator on record is Novera Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2007/1271.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2009-03-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.000 MW
Registered Capacity

πŸ“‹ Project Overview

Fleeter Wood Wind Farm is a 10 MW onshore wind project in North West. The applicant or operator on record is Novera Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2007/1271.

Site Schematic

NORTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)10.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNovera Energy
Owner / operatorNovera Energy
Year consented2009
LocationFleeter Wood, Land adjacent to West House, Dearham, Maryport, Cumbria, CA15 7LD, Cumbria
RegionNorth West
Coordinates54.6968348Β°N, 3.4181287Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines5

πŸ“… Project Timeline

2007-12-17
2009-01-29