πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Flamingo Flowers

Flamingo Flowers, Great North Road, Sandy, Bedfordshire, Bedfordshire, SG19 2AJ

Flamingo Flowers is a 0.5 MW solar farm project in Eastern. The applicant or operator on record is Standard Life Investments Property Holdings. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, reference CB/19/03775/FUL…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2020-06-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.500 MW
Registered Capacity

πŸ“‹ Project Overview

Flamingo Flowers is a 0.5 MW solar farm project in Eastern. The applicant or operator on record is Standard Life Investments Property Holdings. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, reference CB/19/03775/FULL.

Site Schematic

SUBSTATION ? ha Β· 0.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperStandard Life Investments Property Holdings
Owner / operatorStandard Life Investments Property Holdings
LocationFlamingo Flowers, Great North Road, Sandy, Bedfordshire, Bedfordshire, SG19 2AJ
RegionEastern
Coordinates52.1537013Β°N, 0.3022062Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)2800

πŸ“… Project Timeline

2019-11-21