πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Firth Road, Houstoun Industrial Estate - Solar Panels

36 Firth Road Houstoun Industrial Estate, West Lothian, EH54 5DJ

Firth Road, Houstoun Industrial Estate - Solar Panels is a 0.62 MW solar farm project in Scotland. The applicant or operator on record is Prestige Leisure Limited. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is …

Consented / Approved
Project stageConsented
  1. PlanningDec 2025 (completed)
  2. ConsentedMar 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-05-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.620 MW
Registered Capacity

πŸ“‹ Project Overview

Firth Road, Houstoun Industrial Estate - Solar Panels is a 0.62 MW solar farm project in Scotland. The applicant or operator on record is Prestige Leisure Limited. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is West Lothian, reference 0962/FUL/25.

Site Schematic

SUBSTATION ? ha Β· 0.62 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.620 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrestige Leisure Limited
Owner / operatorPrestige Leisure Limited
Year consented2026
Location36 Firth Road Houstoun Industrial Estate, West Lothian, EH54 5DJ
RegionScotland
Coordinates55.9069942Β°N, 3.5077164Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-12-23
2026-03-04