Field House Farm, Hursley, Winchester, Hampshire, SO21 2LE
Field House Solar / Hursley Road is a 6.4 MW solar farm project in South East. The applicant or operator on record is Foresight. It is recorded as operational since March 2015. The determining authority is Winchester, reference 14/00813/FUL.β¦
OperationalΒ· Since 2015
Project stageOperating
PlanningApr 2014 (completed)
ConsentedJul 2014 (completed)
ConstructionJan 2015 (completed)
OperatingMar 2015 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2018-09-04.
Registered planning capacity; not measured generation.
Field House Solar / Hursley Road is a 6.4 MW solar farm project in South East. The applicant or operator on record is Foresight. It is recorded as operational since March 2015. The determining authority is Winchester, reference 14/00813/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.400 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Foresight
Owner / operator
Foresight
Year consented
2014
Construction started
2015
Commissioned / target
2015
Location
Field House Farm, Hursley, Winchester, Hampshire, SO21 2LE