πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Field 279M North East of 15 Tealing

Field 270M North East Of, 15, Tealing, Dundee, Tayside, Angus, DD4 0QZ

Field 279M North East of 15 Tealing is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The application has been withdrawn or the scheme abandoned. The determining authority is Angus, reference 15/00331/FULL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-10-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Field 279M North East of 15 Tealing is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The application has been withdrawn or the scheme abandoned. The determining authority is Angus, reference 15/00331/FULL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Power Consultants
Owner / operatorGreen Power Consultants
Year consented2015
LocationField 270M North East Of, 15, Tealing, Dundee, Tayside, Angus, DD4 0QZ
RegionScotland
Coordinates56.5332902Β°N, 2.9587968Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)92590

πŸ“… Project Timeline

2015-04-20
2015-11-03