Field 270M North East Of, 15, Tealing, Dundee, Tayside, Angus, DD4 0QZ
Field 279M North East of 15 Tealing is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The application has been withdrawn or the scheme abandoned. The determining authority is Angus, reference 15/00331/FULL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedNov 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2017-10-20.
Registered planning capacity; not measured generation.
Field 279M North East of 15 Tealing is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The application has been withdrawn or the scheme abandoned. The determining authority is Angus, reference 15/00331/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Power Consultants
Owner / operator
Green Power Consultants
Year consented
2015