Lands east of Feystown Road
Glenarm; extending between an area situated approximately 750m east of 54 Feystown Road to lands adjacent to 92 Feystown Road. Within the townlands of Ault alias Gowkstown
Clady and Dunteige
Glenarm
Co Antrim., Co. Antrim
Feystown Wind Farm is a 13.8 MW onshore wind project in Northern Ireland. The applicant or operator on record is ABO Wind NI. The planning application was refused. The determining authority is Mid and East Antrim, reference F/2013/0101/F.β¦
Refused
Project stageRefused
PlanningMay 2013 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2016-08-03.
Registered planning capacity; not measured generation.
Feystown Wind Farm is a 13.8 MW onshore wind project in Northern Ireland. The applicant or operator on record is ABO Wind NI. The planning application was refused. The determining authority is Mid and East Antrim, reference F/2013/0101/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
13.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
ABO Wind NI
Owner / operator
ABO Wind NI
Location
Lands east of Feystown Road
Glenarm; extending between an area situated approximately 750m east of 54 Feystown Road to lands adjacent to 92 Feystown Road. Within the townlands of Ault alias Gowkstown
Clady and Dunteige
Glenarm
Co Antrim., Co. Antrim