Solar Farm

Ferrymoor Way, Grimethorpe - Solar Panels

Sash Products Uk Ltd, Ferrymoor Way, Grimethorpe, South Yorkshire, S72 7BN

Ferrymoor Way, Grimethorpe - Solar Panels is a 0.25 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Contrywide Healthcare. Planning permission has been granted as of July 2022 and it is awaiting construction. The determining authority is Barn…

Consented / Approved
Project stageConsented
  1. PlanningMay 2022 (completed)
  2. ConsentedJul 2022 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2022-06-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.250 MW
Registered Capacity

πŸ“‹ Project Overview

Ferrymoor Way, Grimethorpe - Solar Panels is a 0.25 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Contrywide Healthcare. Planning permission has been granted as of July 2022 and it is awaiting construction. The determining authority is Barnsley, reference 2022/0588.

Site Schematic

SUBSTATION ? ha Β· 0.25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.250 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperContrywide Healthcare
Owner / operatorContrywide Healthcare
Year consented2022
LocationSash Products Uk Ltd, Ferrymoor Way, Grimethorpe, South Yorkshire, S72 7BN
RegionYorkshire and Humber
Coordinates53.5756501Β°N, 1.3904865Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-05-27
2022-07-22