Bioenergy / Waste

Fernbrook AD Plant (Waste AD)

Rothwell Lodge Farm, Rothwell, Kettering, Northamptonshire, NN16 8XF

Fernbrook AD Plant (Waste AD) is a 1.5 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Fernbrook Bio Limited. It is recorded as operational since September 2010. The determining authority is North Northamptonshire, reference 09/00033/WAS.…

Operational Β· Since 2010
Project stageOperating
  1. PlanningMay 2009 (completed)
  2. ConsentedOct 2009 (completed)
  3. Construction (completed)
  4. OperatingSep 2010 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2012-03-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.500 MW
Registered Capacity
2010
Commissioned

πŸ“‹ Project Overview

Fernbrook AD Plant (Waste AD) is a 1.5 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Fernbrook Bio Limited. It is recorded as operational since September 2010. The determining authority is North Northamptonshire, reference 09/00033/WAS.

πŸ”§ Technical Specifications

Capacity (MW)1.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFernbrook Bio Limited
Owner / operatorFernbrook Bio Limited
Year consented2009
Commissioned / target2010
LocationRothwell Lodge Farm, Rothwell, Kettering, Northamptonshire, NN16 8XF
RegionEast Midlands
Coordinates52.4119286Β°N, 0.7662472Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2009-05-08
2009-10-22
2010-09-01