Fendyke Farm, Off Old Fendyke, Sutton St James, Spalding, Lincolnshire, PE12 0LX
Fendyke Farm - Solar Farm is a 20 MW solar farm project in East Midlands. The applicant or operator on record is Integrum SPV 21014 Limited. The planning application was refused. The determining authority is South Holland, reference H20-1007-24.β¦
Refused
Project stageRefused
PlanningDec 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-06-10.
Registered planning capacity; not measured generation.
Fendyke Farm - Solar Farm is a 20 MW solar farm project in East Midlands. The applicant or operator on record is Integrum SPV 21014 Limited. The planning application was refused. The determining authority is South Holland, reference H20-1007-24.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Integrum SPV 21014 Limited
Owner / operator
Integrum SPV 21014 Limited
Location
Fendyke Farm, Off Old Fendyke, Sutton St James, Spalding, Lincolnshire, PE12 0LX