Pumped Storage Hydro

Fearna Pumped Storage Hydro Scheme - Hydro Project

4930m NW/O Kingie Lodge, Highland, PH35 4HS

Fearna Pumped Storage Hydro Scheme - Hydro Project is a 1,800 MW pumped storage hydro project in Scotland. The applicant or operator on record is Fearna PSH Limited (SSE Renewables). The scheme is currently in the planning system, submitted March 2025. The determining authority i…

In Planning
Project stageIn planning
  1. PlanningMar 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2026-07-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1,800.000 MW
Registered Capacity

πŸ“‹ Project Overview

Fearna Pumped Storage Hydro Scheme - Hydro Project is a 1,800 MW pumped storage hydro project in Scotland. The applicant or operator on record is Fearna PSH Limited (SSE Renewables). The scheme is currently in the planning system, submitted March 2025. The determining authority is Scottish Government (S36), reference ECU00005061.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID ⇑ PUMP ⇓ GENERATE HEAD: ?m Β· POWER: 1,800.000 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1,800.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFearna PSH Limited (SSE Renewables)
Owner / operatorFearna PSH Limited (SSE Renewables)
Location4930m NW/O Kingie Lodge, Highland, PH35 4HS
RegionScotland
Coordinates57.062649Β°N, 5.1235595Β°W

Additional published register fields

Registered technologyPumped Storage Hydroelectricity

πŸ“… Project Timeline

2025-03-02