Land to the east of Cockley Road Farthinghoe, Northamptonshire
Farthinghoe Solar Farm is a 10 MW solar farm project in East Midlands. The applicant or operator on record is Green Energy UK Direct. The planning application was refused. The determining authority is West Northamptonshire, reference S/2014/1495/MAF.β¦
Refused
Project stageRefused
PlanningAug 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2014-11-23.
Registered planning capacity; not measured generation.
Farthinghoe Solar Farm is a 10 MW solar farm project in East Midlands. The applicant or operator on record is Green Energy UK Direct. The planning application was refused. The determining authority is West Northamptonshire, reference S/2014/1495/MAF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Energy UK Direct
Owner / operator
Green Energy UK Direct
Location
Land to the east of Cockley Road Farthinghoe, Northamptonshire