Farnsfield AD is a 2 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Fresh Growers. The application has been withdrawn or the scheme abandoned. The determining authority is Newark and Sherwood, reference F/3308.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2015-10-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Farnsfield AD is a 2 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Fresh Growers. The application has been withdrawn or the scheme abandoned. The determining authority is Newark and Sherwood, reference F/3308.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFresh Growers
Owner / operatorFresh Growers
LocationLand south of Baulker Lane, Farnsfield, Nottinghamshire
RegionEast Midlands
Coordinates53.1023454Β°N, 1.0717224Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2015-06-19