Farlington Water Treatment Works, Gillman Road, Portsmouth, Hampshire, PO6 1BN
Farlington Water Treatment Works, Gillman Road - Solar Panels is a 3.68 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water Limited. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining β¦
Consented / Approved
Project stageConsented
PlanningAug 2022 (completed)
ConsentedNov 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-12-01.
Registered planning capacity; not measured generation.
Farlington Water Treatment Works, Gillman Road - Solar Panels is a 3.68 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water Limited. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining authority is Portsmouth, reference 22/01237/CPL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.680 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Portsmouth Water Limited
Owner / operator
Portsmouth Water Limited
Year consented
2022
Location
Farlington Water Treatment Works, Gillman Road, Portsmouth, Hampshire, PO6 1BN