Far Grange Caravan Park, Hornsea Road, Skipsea, Driffield, East Riding of Yorkshire, YO25 8SY
Far Grange Caravan Park, Hornsea Road - Solar Panels is a 0.21 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Bourne Leisure Limited. Planning permission has been granted as of April 2023 and it is awaiting construction. The determining authβ¦
Consented / Approved
Project stageConsented
PlanningMar 2023 (completed)
ConsentedApr 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-07-06.
Registered planning capacity; not measured generation.
Far Grange Caravan Park, Hornsea Road - Solar Panels is a 0.21 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Bourne Leisure Limited. Planning permission has been granted as of April 2023 and it is awaiting construction. The determining authority is East Riding of Yorkshire, reference 23/00583/PVNOT.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.210 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Bourne Leisure Limited
Owner / operator
Bourne Leisure Limited
Year consented
2023
Location
Far Grange Caravan Park, Hornsea Road, Skipsea, Driffield, East Riding of Yorkshire, YO25 8SY