πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Faltec, International Drive - Solar panels

4 International Drive, Sunderland, Tyne And Wear, SR5 3FH

Faltec, International Drive - Solar panels is a 0.67 MW solar farm project in North East. The applicant or operator on record is Faltec Europe Limited. Planning permission has been granted as of November 2024 and it is awaiting construction. The determining authority is Sunderlan…

Consented / Approved
Project stageConsented
  1. PlanningOct 2024 (completed)
  2. ConsentedNov 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-01-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.670 MW
Registered Capacity

πŸ“‹ Project Overview

Faltec, International Drive - Solar panels is a 0.67 MW solar farm project in North East. The applicant or operator on record is Faltec Europe Limited. Planning permission has been granted as of November 2024 and it is awaiting construction. The determining authority is Sunderland, reference 24/01976/PCZ.

Site Schematic

SUBSTATION ? ha Β· 0.67 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.670 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFaltec Europe Limited
Owner / operatorFaltec Europe Limited
Year consented2024
Location4 International Drive, Sunderland, Tyne And Wear, SR5 3FH
RegionNorth East
Coordinates54.9259263Β°N, 1.4761576Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Are they re-applying (Old REPD Ref) 16591

πŸ“… Project Timeline

2024-10-02
2024-11-26