Faldo Farm

Faldo Farm, Faldo Road, Barton-le-Clay, Bedford, Bedfordshire, MK45 4RF

Faldo Farm is a 10.8 MW solar farm project in Eastern. The applicant or operator on record is Faldo Solar Farm Ltd. The planning application was refused. The determining authority is Central Bedfordshire, reference CB/14/02447/FULL.…

Refused
Project stageRefused
  1. PlanningJul 2014 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-11-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.800 MW
Registered Capacity

πŸ“‹ Project Overview

Faldo Farm is a 10.8 MW solar farm project in Eastern. The applicant or operator on record is Faldo Solar Farm Ltd. The planning application was refused. The determining authority is Central Bedfordshire, reference CB/14/02447/FULL.

Site Schematic

SUBSTATION ? ha Β· 10.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)10.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFaldo Solar Farm Ltd
Owner / operatorFaldo Solar Farm Ltd
LocationFaldo Farm, Faldo Road, Barton-le-Clay, Bedford, Bedfordshire, MK45 4RF
RegionEastern
Coordinates51.9750437Β°N, 0.4369744Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)161618

πŸ“… Project Timeline

2014-07-02