Fairfield Pool, Lowfield Street - Solar Panels is a 0.41 MW solar farm project in South East. The applicant or operator on record is Dartford Borough Council. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is Dar…

Consented / Approved
Project stageConsented
  1. PlanningJul 2023 (completed)
  2. ConsentedOct 2023 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-10-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.410 MW
Registered Capacity

πŸ“‹ Project Overview

Fairfield Pool, Lowfield Street - Solar Panels is a 0.41 MW solar farm project in South East. The applicant or operator on record is Dartford Borough Council. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is Dartford, reference 23/00743/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.41 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.410 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDartford Borough Council
Owner / operatorDartford Borough Council
Year consented2023
LocationFairfield Pool, Electricity Sub Station At Lowfield Street, Dartford, Kent, DA1 1JB
RegionSouth East
Coordinates51.4390899Β°N, 0.216688Β°E

Additional published register fields

Registered technologySolar Photovoltaics
CfD Capacity (MW)
Turbine Capacity (MW)
No. of Turbines
Height of Turbines (m)
Mounting Type for SolarRoof
Are they re-applying (New REPD Ref)
Are they re-applying (Old REPD Ref)
Solar Site Area (sqm)13842

πŸ“… Project Timeline

2023-07-21
2023-10-16