Fairfield - Battery Energy Storage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Green Switch Capital. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2025/1015.β¦
Refused
Project stageRefused
PlanningJul 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-04-27.
Registered planning capacity; not measured generation.
Fairfield - Battery Energy Storage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Green Switch Capital. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2025/1015.