Solar Farm

Eyemouth Freezers, Toll Bridge Road - Solar Panels

Eyemouth Freezers Ltd Toll Bridge Road, Borders, TD14 5GN

Eyemouth Freezers, Toll Bridge Road - Solar Panels is a 1.2 MW solar farm project in Scotland. The applicant or operator on record is Eyemouth Freezers Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is Sco…

Consented / Approved
Project stageConsented
  1. PlanningFeb 2024 (completed)
  2. ConsentedApr 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-05-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.200 MW
Registered Capacity

πŸ“‹ Project Overview

Eyemouth Freezers, Toll Bridge Road - Solar Panels is a 1.2 MW solar farm project in Scotland. The applicant or operator on record is Eyemouth Freezers Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is Scottish Borders, reference 24/00208/FUL.

Site Schematic

SUBSTATION ? ha Β· 1.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEyemouth Freezers Limited
Owner / operatorEyemouth Freezers Limited
Year consented2024
LocationEyemouth Freezers Ltd Toll Bridge Road, Borders, TD14 5GN
RegionScotland
Coordinates55.8686637Β°N, 2.1006923Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)7903

πŸ“… Project Timeline

2024-02-26
2024-04-04