Solar Farm

Ewerby Thorpe Farm

Ewerby Thorpe Farm, Ewerby Thorpe, Sleaford, Lincolnshire, NG34 9PR, Lincolnshire

Ewerby Thorpe Farm is a 25 MW solar farm project in East Midlands. The applicant or operator on record is Estover Energy. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven, reference 14/1003/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-10-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

25.000 MW
Registered Capacity

πŸ“‹ Project Overview

Ewerby Thorpe Farm is a 25 MW solar farm project in East Midlands. The applicant or operator on record is Estover Energy. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven, reference 14/1003/FUL.

Site Schematic

SUBSTATION ? ha Β· 25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)25.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEstover Energy
Owner / operatorEstover Energy
Year consented2014
LocationEwerby Thorpe Farm, Ewerby Thorpe, Sleaford, Lincolnshire, NG34 9PR, Lincolnshire
RegionEast Midlands
Coordinates53.0144699Β°N, 0.3145418Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)539000

πŸ“… Project Timeline

2014-08-07
2014-10-03