πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Europa Way, Units F1 & F2 - Solar panels

AMR Textiles Ltd, Units F1, F2, E2, E3, and E4, Europa Way, Stoneclough Radcliffe, Bolton, ., Greater Manchester, M26 1GG

Europa Way, Units F1 & F2 - Solar panels is a 0.86 MW solar farm project in North West. The applicant or operator on record is Amr Textiles Limited. The planning application was refused. The determining authority is Bolton, reference 13568/22.…

Refused
Project stageRefused
  1. PlanningFeb 2022 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2022-05-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.860 MW
Registered Capacity

πŸ“‹ Project Overview

Europa Way, Units F1 & F2 - Solar panels is a 0.86 MW solar farm project in North West. The applicant or operator on record is Amr Textiles Limited. The planning application was refused. The determining authority is Bolton, reference 13568/22.

Site Schematic

SUBSTATION ? ha Β· 0.86 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.860 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAmr Textiles Limited
Owner / operatorAmr Textiles Limited
LocationAMR Textiles Ltd, Units F1, F2, E2, E3, and E4, Europa Way, Stoneclough Radcliffe, Bolton, ., Greater Manchester, M26 1GG
RegionNorth West
Coordinates53.543556Β°N, 2.3684745Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-02-09