Epney, Framilode - Solar Farm & Battery Storage is a 49.5 MW solar farm project in South West. The applicant or operator on record is PACE Tribute Energy Limited. The planning application was refused. The determining authority is Stroud, reference S.25/1011/FUL.β¦
Refused
Project stageRefused
PlanningJun 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-12-09.
Registered planning capacity; not measured generation.
Epney, Framilode - Solar Farm & Battery Storage is a 49.5 MW solar farm project in South West. The applicant or operator on record is PACE Tribute Energy Limited. The planning application was refused. The determining authority is Stroud, reference S.25/1011/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.