Solar Farm

Epney, Framilode - Solar Farm & Battery Storage

Epney Framilode, Gloucestershire, GL2 7LN

Epney, Framilode - Solar Farm & Battery Storage is a 49.5 MW solar farm project in South West. The applicant or operator on record is PACE Tribute Energy Limited. The planning application was refused. The determining authority is Stroud, reference S.25/1011/FUL.…

Refused
Project stageRefused
  1. PlanningJun 2025 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-12-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.500 MW
Registered Capacity

πŸ“‹ Project Overview

Epney, Framilode - Solar Farm & Battery Storage is a 49.5 MW solar farm project in South West. The applicant or operator on record is PACE Tribute Energy Limited. The planning application was refused. The determining authority is Stroud, reference S.25/1011/FUL.

Site Schematic

SUBSTATION ? ha Β· 49.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPACE Tribute Energy Limited
Owner / operatorPACE Tribute Energy Limited
LocationEpney Framilode, Gloucestershire, GL2 7LN
RegionSouth West
Coordinates51.7978028Β°N, 2.3461323Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID17805
Mounting Type for SolarGround
Solar Site Area (sqm)486000

πŸ“… Project Timeline

2025-06-16