Land at Gwernigron Farm, The Roe, St Asaph,, Denbighshire, LL17 0HY
Elwy Solar Energy Farm is a 62 MW solar farm project in Wales. The applicant or operator on record is Statkraft UK Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference DNS/3247619.β¦
Refused
Project stageRefused
PlanningMar 2021 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2022-07-01.
Registered planning capacity; not measured generation.
Elwy Solar Energy Farm is a 62 MW solar farm project in Wales. The applicant or operator on record is Statkraft UK Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference DNS/3247619.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
62.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Statkraft UK Limited
Owner / operator
Statkraft UK Limited
Location
Land at Gwernigron Farm, The Roe, St Asaph,, Denbighshire, LL17 0HY