Elwy Solar Energy Farm is a 62 MW solar farm project in Wales. The applicant or operator on record is Statkraft UK Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference DNS/3247619.…

Refused
Project stageRefused
  1. PlanningMar 2021 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2022-07-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

62.000 MW
Registered Capacity

πŸ“‹ Project Overview

Elwy Solar Energy Farm is a 62 MW solar farm project in Wales. The applicant or operator on record is Statkraft UK Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference DNS/3247619.

Site Schematic

SUBSTATION ? ha Β· 62 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)62.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperStatkraft UK Limited
Owner / operatorStatkraft UK Limited
LocationLand at Gwernigron Farm, The Roe, St Asaph,, Denbighshire, LL17 0HY
RegionWales
Coordinates53.2665802Β°N, 3.4627721Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID7863
Mounting Type for SolarGround

πŸ“… Project Timeline

2021-03-22