Solar Farm

Elvington Water Treatment Works

Elvington Water Treatment Work, Kexby Lane, Elvington, York, North Yorkshire, YO41 4BA

Elvington Water Treatment Works is a 1.8 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Kelda Energy Services. The application has been withdrawn or the scheme abandoned. The determining authority is York, reference 15/02639/FULM.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.800 MW
Registered Capacity

πŸ“‹ Project Overview

Elvington Water Treatment Works is a 1.8 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Kelda Energy Services. The application has been withdrawn or the scheme abandoned. The determining authority is York, reference 15/02639/FULM.

Site Schematic

SUBSTATION ? ha Β· 1.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperKelda Energy Services
Owner / operatorKelda Energy Services
Year consented2016
LocationElvington Water Treatment Work, Kexby Lane, Elvington, York, North Yorkshire, YO41 4BA
RegionYorkshire and Humber
Coordinates53.9249809Β°N, 0.9327336Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)41000

πŸ“… Project Timeline

2015-12-18
2016-05-13