π Project Overview
Elvington Solar Farm is a 49.5 MW solar farm project in South East. The applicant or operator on record is Pathfinder Clean Energy UK Limited. The scheme is currently in the planning system, submitted June 2025. The determining authority is Dover, reference 25/00709.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Pathfinder Clean Energy UK Limited |
| Owner / operator | Pathfinder Clean Energy UK Limited |
| Location | South & E/O Thornton Road, Tilmanstone, Deal, Kent, CT14 0JN |
| Region | South East |
| Coordinates | 51.2228231Β°N, 1.2834595Β°E |