Elswick is a 1 MW bioenergy / waste project in North West. The applicant or operator on record is Biogen Power. The application has been withdrawn or the scheme abandoned. The determining authority is Fylde, reference 05/0795.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2005 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2013-12-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.000 MW
Registered Capacity

πŸ“‹ Project Overview

Elswick is a 1 MW bioenergy / waste project in North West. The applicant or operator on record is Biogen Power. The application has been withdrawn or the scheme abandoned. The determining authority is Fylde, reference 05/0795.

πŸ”§ Technical Specifications

Capacity (MW)1.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiogen Power
Owner / operatorBiogen Power
Year consented2005
LocationGorst Farm, Lodge Lane, Elswick, Preston, Lancashire
RegionNorth West
Coordinates53.8375654Β°N, 2.8739461Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2005-08-18
2005-12-14