Land At Elm Farm Bristol Road Iron Acton, Gloucestershire, BS37 9TF
Elm Farm solar farm and Battery storage is a 24 MW solar farm project in South West. The applicant or operator on record is Enso Energy Limited. The planning application was refused. The determining authority is South Gloucestershire, reference P21/04721/F.β¦
Refused
Project stageRefused
PlanningJul 2021 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2021-03-04.
Registered planning capacity; not measured generation.
Elm Farm solar farm and Battery storage is a 24 MW solar farm project in South West. The applicant or operator on record is Enso Energy Limited. The planning application was refused. The determining authority is South Gloucestershire, reference P21/04721/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
24.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Enso Energy Limited
Owner / operator
Enso Energy Limited
Location
Land At Elm Farm Bristol Road Iron Acton, Gloucestershire, BS37 9TF