Solar Farm

Elm Farm solar farm and Battery storage

Land At Elm Farm Bristol Road Iron Acton, Gloucestershire, BS37 9TF

Elm Farm solar farm and Battery storage is a 24 MW solar farm project in South West. The applicant or operator on record is Enso Energy Limited. The planning application was refused. The determining authority is South Gloucestershire, reference P21/04721/F.…

Refused
Project stageRefused
  1. PlanningJul 2021 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2021-03-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

24.000 MW
Registered Capacity

πŸ“‹ Project Overview

Elm Farm solar farm and Battery storage is a 24 MW solar farm project in South West. The applicant or operator on record is Enso Energy Limited. The planning application was refused. The determining authority is South Gloucestershire, reference P21/04721/F.

Site Schematic

SUBSTATION ? ha Β· 24 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)24.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEnso Energy Limited
Owner / operatorEnso Energy Limited
LocationLand At Elm Farm Bristol Road Iron Acton, Gloucestershire, BS37 9TF
RegionSouth West
Coordinates51.5478013Β°N, 2.4768635Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID8487
Mounting Type for SolarGround
Solar Site Area (sqm)380500

πŸ“… Project Timeline

2021-07-05