Ellington South Site Lynemouth Morpeth, Northumberland, NE61 5XL
Ellington South Site, Lynemouth Solar Array is a 1.2 MW solar farm project in North East. The applicant or operator on record is The Coal Authority. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is Northumberland,β¦
Consented / Approved
Project stageConsented
PlanningApr 2021 (completed)
ConsentedMar 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2021-05-18.
Registered planning capacity; not measured generation.
Ellington South Site, Lynemouth Solar Array is a 1.2 MW solar farm project in North East. The applicant or operator on record is The Coal Authority. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is Northumberland, reference 21/01380/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
The Coal Authority
Owner / operator
The Coal Authority
Year consented
2023
Location
Ellington South Site Lynemouth Morpeth, Northumberland, NE61 5XL