Eland House Eland Road Denaby, Doncaster, South Yorkshire, E16 2BB
Eland House, Denaby - Solar Panels is a 0.33 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Eland Cables Limited. The scheme is currently in the planning system, submitted April 2022. The determining authority is Doncaster, reference 22/0092β¦
In Planning
Project stageIn planning
PlanningApr 2022 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2022-05-27.
Registered planning capacity; not measured generation.
Eland House, Denaby - Solar Panels is a 0.33 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Eland Cables Limited. The scheme is currently in the planning system, submitted April 2022. The determining authority is Doncaster, reference 22/00920/PRIOR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.330 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Eland Cables Limited
Owner / operator
Eland Cables Limited
Location
Eland House Eland Road Denaby, Doncaster, South Yorkshire, E16 2BB