Solar Farm

Edinburgh Way - Solar Photovolatic Panel

Pilgrim, Edinburgh Way, Corsham,, Wiltshire, SN13 9XZ

Edinburgh Way - Solar Photovolatic Panel is a 0.7 MW solar farm project in South West. The applicant or operator on record is EDF Energy Renewables. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authority is Wiltshire, …

Consented / Approved
Project stageConsented
  1. PlanningJul 2022 (completed)
  2. ConsentedSep 2022 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2022-08-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.700 MW
Registered Capacity

πŸ“‹ Project Overview

Edinburgh Way - Solar Photovolatic Panel is a 0.7 MW solar farm project in South West. The applicant or operator on record is EDF Energy Renewables. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authority is Wiltshire, reference PL/2022/05332.

Site Schematic

SUBSTATION ? ha Β· 0.7 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEDF Energy Renewables
Owner / operatorEDF Energy Renewables
Year consented2022
LocationPilgrim, Edinburgh Way, Corsham,, Wiltshire, SN13 9XZ
RegionSouth West
Coordinates51.4204838Β°N, 2.1981233Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-07-25
2022-09-15