Shotton
, Shotton colliery to the north and Bracken hill industrial estate to west off an unclassified road on the B1280, County Durham
Edder Acres Farm is a 5 MW onshore wind project in North East. The applicant or operator on record is A7 Energy, 42 Shepherd St, London. The planning application was refused. The determining authority is County Durham, reference HIST/2004/1823.β¦
Refused
Project stageRefused
PlanningDec 2004 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2010-06-09.
Registered planning capacity; not measured generation.
Edder Acres Farm is a 5 MW onshore wind project in North East. The applicant or operator on record is A7 Energy, 42 Shepherd St, London. The planning application was refused. The determining authority is County Durham, reference HIST/2004/1823.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
A7 Energy, 42 Shepherd St, London
Owner / operator
A7 Energy, 42 Shepherd St, London
Location
Shotton
, Shotton colliery to the north and Bracken hill industrial estate to west off an unclassified road on the B1280, County Durham