100 Metres SW/o East Gormack Farm, Blairgowrie, Tayside, PH10 7AH
East Gormack Farm - Solar Panels is a 0.75 MW solar farm project in Scotland. The applicant or operator on record is Lornty Farms. Planning permission has been granted as of May 2023 and it is awaiting construction. The determining authority is Perth and Kinross, reference 23/000β¦
Consented / Approved
Project stageConsented
PlanningJan 2023 (completed)
ConsentedMay 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-06-19.
Registered planning capacity; not measured generation.
East Gormack Farm - Solar Panels is a 0.75 MW solar farm project in Scotland. The applicant or operator on record is Lornty Farms. Planning permission has been granted as of May 2023 and it is awaiting construction. The determining authority is Perth and Kinross, reference 23/00012/FLL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.750 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lornty Farms
Owner / operator
Lornty Farms
Year consented
2023
Location
100 Metres SW/o East Gormack Farm, Blairgowrie, Tayside, PH10 7AH