Solar Farm

East Codford Solar Farm Extension Phase 3

Clay Pit Hill Codford Down Eas, Codford, Warminster, Wiltshire, BA12 0PJ

East Codford Solar Farm Extension Phase 3 is a 18 MW solar farm project in South West. The applicant or operator on record is Centrica Plc. It is recorded as operational since September 2022. The determining authority is Wiltshire, reference 19/03576/FUL.…

Operational Β· Since 2022
Project stageOperating
  1. PlanningApr 2019 (completed)
  2. ConsentedDec 2020 (completed)
  3. ConstructionApr 2022 (completed)
  4. OperatingSep 2022 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2023-06-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

18.000 MW
Registered Capacity
2022
Commissioned

πŸ“‹ Project Overview

East Codford Solar Farm Extension Phase 3 is a 18 MW solar farm project in South West. The applicant or operator on record is Centrica Plc. It is recorded as operational since September 2022. The determining authority is Wiltshire, reference 19/03576/FUL.

Site Schematic

SUBSTATION ? ha Β· 18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)18.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCentrica Plc
Owner / operatorCentrica Plc
Year consented2020
Construction started2022
Commissioned / target2022
LocationClay Pit Hill Codford Down Eas, Codford, Warminster, Wiltshire, BA12 0PJ
RegionSouth West
Coordinates51.1788266Β°N, 2.0078896Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref) 6655
Solar Site Area (sqm)177500

πŸ“… Project Timeline

2019-04-08
2020-12-18
2022-04-25
2022-09-01