Solar Farm

East Codford Solar Farm Extension Phase 3

Clay Pit Hill Codford Down Eas, Codford, Warminster, Wiltshire, BA12 0PJ

East Codford Solar Farm Extension Phase 3 is a 18 MW solar farm project in South West. The applicant or operator on record is Centrica Plc. It is recorded as operational since September 2022. The determining authority is Wiltshire, reference 19/03576/FUL.…

Operational Β· Since 2022
18 MW
Installed Capacity
2022
Commissioned

πŸ“‹ Project Overview

East Codford Solar Farm Extension Phase 3 is a 18 MW solar farm project in South West. The applicant or operator on record is Centrica Plc. It is recorded as operational since September 2022. The determining authority is Wiltshire, reference 19/03576/FUL.

Site Schematic

SUBSTATION ? ha Β· 18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)18 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCentrica Plc
Owner / operatorCentrica Plc
Year consented2020
Construction started2022
Commissioned / target2022
LocationClay Pit Hill Codford Down Eas, Codford, Warminster, Wiltshire, BA12 0PJ
RegionSouth West
Coordinates51.1788266Β°N, 2.0078897Β°W

πŸ“… Project Timeline