π Project Overview
East Codford Solar Farm Extension Phase 3 is a 18 MW solar farm project in South West. The applicant or operator on record is Centrica Plc. It is recorded as operational since September 2022. The determining authority is Wiltshire, reference 19/03576/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 18 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Centrica Plc |
| Owner / operator | Centrica Plc |
| Year consented | 2020 |
| Construction started | 2022 |
| Commissioned / target | 2022 |
| Location | Clay Pit Hill Codford Down Eas, Codford, Warminster, Wiltshire, BA12 0PJ |
| Region | South West |
| Coordinates | 51.1788266Β°N, 2.0078897Β°W |