Solar Farm

Eagle Bridge Health and Wellbeing Centre, Dunwoody Way - Solar panels

Eagle Bridge Health Wellbeing Centre, Dunwoody Way, Crewe, Cheshire, CW1 3AW

Eagle Bridge Health and Wellbeing Centre, Dunwoody Way - Solar panels is a 0.44 MW solar farm project in North West. The applicant or operator on record is Assura Aspire Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The determinin…

Consented / Approved
Project stageConsented
  1. PlanningFeb 2024 (completed)
  2. ConsentedMar 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-04-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.440 MW
Registered Capacity

πŸ“‹ Project Overview

Eagle Bridge Health and Wellbeing Centre, Dunwoody Way - Solar panels is a 0.44 MW solar farm project in North West. The applicant or operator on record is Assura Aspire Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The determining authority is Cheshire East, reference 23/4708N.

Site Schematic

SUBSTATION ? ha Β· 0.44 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.440 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAssura Aspire Limited
Owner / operatorAssura Aspire Limited
Year consented2024
LocationEagle Bridge Health Wellbeing Centre, Dunwoody Way, Crewe, Cheshire, CW1 3AW
RegionNorth West
Coordinates53.0985036Β°N, 2.4525177Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-02-02
2024-03-25