Dykehead Farm wind turbine 3 is a 2.3 MW onshore wind project in Scotland. The applicant or operator on record is Dykehead Renewables Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is South Lanarkshire, reference EK/14/0014.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-12-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.300 MW
Registered Capacity

πŸ“‹ Project Overview

Dykehead Farm wind turbine 3 is a 2.3 MW onshore wind project in Scotland. The applicant or operator on record is Dykehead Renewables Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is South Lanarkshire, reference EK/14/0014.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDykehead Renewables Ltd
Owner / operatorDykehead Renewables Ltd
LocationDykehead Farm Chapelton ML10 6SL, Strathclyde
RegionScotland
Coordinates55.7066655Β°N, 4.1332432Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.3
No. of Turbines1

πŸ“… Project Timeline

2014-01-23