Solar Farm

Dyffryn Farm, Ynysmaerdy - Solar Panels

Dyffryn Farm, Ynysmaerdy, Pontyclun, Mid Glamorgan, CF72 8LN

Dyffryn Farm, Ynysmaerdy - Solar Panels is a 9.9 MW solar farm project in Wales. The applicant or operator on record is Windel Solar 8 Limited. The scheme is currently in the planning system, submitted December 2025. The determining authority is Rhondda Cynon Taf, reference 25/12…

In Planning
Project stageIn planning
  1. PlanningDec 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2026-01-22.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.900 MW
Registered Capacity

πŸ“‹ Project Overview

Dyffryn Farm, Ynysmaerdy - Solar Panels is a 9.9 MW solar farm project in Wales. The applicant or operator on record is Windel Solar 8 Limited. The scheme is currently in the planning system, submitted December 2025. The determining authority is Rhondda Cynon Taf, reference 25/1280/FUL.

Site Schematic

SUBSTATION ? ha Β· 9.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWindel Solar 8 Limited
Owner / operatorWindel Solar 8 Limited
LocationDyffryn Farm, Ynysmaerdy, Pontyclun, Mid Glamorgan, CF72 8LN
RegionWales
Coordinates51.5532701Β°N, 3.4003531Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)209200

πŸ“… Project Timeline

2025-12-23