Duo Plastics Limited, Vickers Street, Manchester, Greater Manchester, M40 8PU
Duo Plastics Limited, Vickers Street - Solar Panels is a 0.56 MW solar farm project in North West. The applicant or operator on record is Ashcroft Electrical Services Limited. The scheme is currently in the planning system, submitted September 2024. The determining authority is Mβ¦
In Planning
Project stageIn planning
PlanningSep 2024 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2024-11-05.
Registered planning capacity; not measured generation.
Duo Plastics Limited, Vickers Street - Solar Panels is a 0.56 MW solar farm project in North West. The applicant or operator on record is Ashcroft Electrical Services Limited. The scheme is currently in the planning system, submitted September 2024. The determining authority is Manchester, reference 141102/P14J/2024.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.560 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ashcroft Electrical Services Limited
Owner / operator
Ashcroft Electrical Services Limited
Location
Duo Plastics Limited, Vickers Street, Manchester, Greater Manchester, M40 8PU